Hai,
Can anyone tell me about the difference between the Bill of Quantity(BOQ) and Bill of Materials(BOM).
Regards,
Kughan.
Bidding document prepared usually by a quantity surveyor, it is an itemized list of materials, parts, and labor (with their costs) required to construct, maintain, or repair a specific structure.
List of materials required by a contractor to complete a contract, or by a supplier or vendor to complete an order.
List of all raw materials, parts, intermediates, sub-assemblies, etc., (with their quantities and description) required to construct, overhaul, or repair something.